Project controls standards platform

Every Project. Measured Against the Standard.

بِالمِعْيَارِ نَقِيسُ.. وَبِالدَّلِيلِ نَحْكُمُ

We measure by the standard. We decide by the evidence.

One platform of rule-based standards for project controls – pre-qualification, tender evaluation, schedules, claims and procurement. Every input runs through the same formulas, thresholds and weights, and comes out as a score, a flag and a report you can defend.

Free 30-day trial on every service – no credit card. Your workspace is ready in a minute.

Invited to PQQ? Enter your access PIN

Illustrative · Main works package

Measured against the standard

Pass

82.4%

Weighted score · Cut-off 70%

  • Formula checks43 / 43Pass
  • Threshold flags2Flag
  • Compliance gates6 / 6Pass
Illustrative example – not a real bidder or project.
standards on one engine
6
standards on one engine
weighted PQQ criteria
43
weighted PQQ criteria
countries covered
4
countries covered
rule-based – no AI
100%
rule-based – no AI

The six standards

Six standards. One evaluation engine.

Consultants and contractors work on the same rules – one source of truth for every score, flag and report. Each standard turns a defined input into a defined output.

  1. Live

    01

    PQQ Standard

    التأهيل المسبق

    Pre-qualify contractors on 43 weighted criteria, with compliance gates and a second, independent engine checking every score.

    Input: Contractor fileOutput: Weighted score
    Start free
  2. Coming soon

    02

    Tender Financial Evaluation

    التقييم المالي للعطاءات

    Compare priced BOQs item by item from one locked template – with flags, an arithmetic check and one consolidated workbook.

    Input: Priced BOQsOutput: Comparison Excel
    Start free
  3. Coming soon

    03

    Schedule Automated Review

    المراجعة الآلية للجدول الزمني

    Check the baseline programme against the DCMA 14-Point Assessment and custom rules – a quality score and an Excel report.

    Input: Baseline XEROutput: Quality score
    Start free
  4. Coming soon

    04

    Automated Dashboard from P6

    لوحة المؤشرات الآلية من P6

    Turn every P6 update into progress, earned value, the longest path and look-aheads – compared with the baseline and the previous update.

    Input: Update XEROutput: Live dashboard
    Start free
  5. Coming soon

    05

    Claim Readiness

    جاهزية المطالبة

    A weighted questionnaire based on the SCL Delay and Disruption Protocol: how ready a claim is, and which evidence is missing.

    Input: QuestionnaireOutput: Readiness score
    Start free
  6. Coming soon

    06

    Procurement Automated Tracker

    المتابعة الآلية للمشتريات

    Track the procurement log against the baseline schedule dates – early warnings before a delay reaches site.

    Input: Procurement logOutput: Early warnings
    Start free

How it works

Every standard follows the same three steps

  1. 01

    Upload

    The input in the standard’s own template: a contractor file, priced BOQs, an XER, a questionnaire or a log.

  2. 02

    Rules engine

    Written formulas, thresholds and weighted criteria – configurable per project, never hidden – measure every item the same way.

  3. 03

    Report

    Scores and flags against the thresholds, on a dashboard and in a report you can export and share.

Built for

One standard on both sides of the contract

Consultants & Developers

Run pre-qualifications and evaluations for your projects and clients – your organization, your weights, your reports.

  • Pre-qualify and rank contractors on evidence
  • Compare bidders’ priced BOQs in one workbook
  • Review baselines and every schedule update
  • Track procurement against the programme

Contractors

Answer invitations with one company profile – and measure your own subcontractors and schedules with the same standards.

  • Respond to tender invitations with your access PIN
  • One company profile and document vault
  • Evaluate your subcontractors’ financial offers
  • Check your schedule and claim readiness before you submit

No black box

Every number has a formula behind it.

MEYAR scores with written rules only. You can see – and set – every threshold and weight that produced a result.

The PQQ criterion score, as the engine computes it

weighted = weight × score ÷ 5

  • Rule-based, never AI

    Formulas, thresholds and weighted criteria only. No AI or language model scores anything.

  • Configurable, not hard-coded

    Thresholds, weights and settings are data you can read and set per project.

  • Traceable to the evidence

    Every score leads back to the document or line it came from, and every change is in the audit log.

  • Checked twice

    PQQ results are recomputed by a second, independent engine and compared value by value.

Coverage

Saudi Arabia, Egypt, UAE and Qatar

Aligned with local tendering, pre-qualification and statutory requirements in each country – amounts in the local currency, deadlines in local time.

Saudi Arabia · SAR

المملكة العربية السعودية

Egypt · EGP

مصر

United Arab Emirates · AED

الإمارات العربية المتحدة

Qatar · QAR

قطر

Start today

Your workspace, ready in a minute.

Sign up, choose your role – consultant / developer or contractor – and open the standards you need. No forms, no waiting for approval.

  • Free 30-day trial on every service
  • Arabic and English
  • Rule-based – no AI

Invited to PQQ? Enter your access PINOrganization-wide set-up? Talk to us

MEYAR — Project Controls Standards | مِعْيَار